Hello!
Our Gymnast Club are going to rebuild an exicting hall into a gymnasium with apparatus and landing pit. Unfouryanley, it is impossible to dig down a pit, so we have to buid it above ground. I am trying to design it, but I am very unsure about the dimensions of the rig. I have a background as an engineer for offshorework, and concrete industry, so I am afraid that I will overdimension the rig. I am most unsure about the support of the high bar, end uneven bars.
Do any of you have some experiences about that kind of pit? I have searched, and searched the net, but can't find some details.
Would you recommend a bungy-pit or a loose foam pit?
I am planning to prefabricate the bin in sections outside the gym, and mount it together on site.
The hall ahas very limitad space, so I will use some kund of spce savers, similar to the AAI SRS system, but plan to weld it together by my self. Any experiences?
Thanks for all tips!
Our Gymnast Club are going to rebuild an exicting hall into a gymnasium with apparatus and landing pit. Unfouryanley, it is impossible to dig down a pit, so we have to buid it above ground. I am trying to design it, but I am very unsure about the dimensions of the rig. I have a background as an engineer for offshorework, and concrete industry, so I am afraid that I will overdimension the rig. I am most unsure about the support of the high bar, end uneven bars.
Do any of you have some experiences about that kind of pit? I have searched, and searched the net, but can't find some details.
Would you recommend a bungy-pit or a loose foam pit?
I am planning to prefabricate the bin in sections outside the gym, and mount it together on site.
The hall ahas very limitad space, so I will use some kund of spce savers, similar to the AAI SRS system, but plan to weld it together by my self. Any experiences?
Thanks for all tips!