Coaches Bungee harness - please help

DON'T LURK... Join The Discussion!

Members see FEWER ads

Thanks for your replies.

I suppose, that the video uploaded by Kstp is a design with steel wires along the track. I know of one of the same at Skyum Idrætsefterskole in Denmark of similar design:
http://www.youtube.com/watch?v=nbD0a6jrrvM

This is of cause better. Someone in Denmark has tried to use a steel bar system, but it was not succesfull. The Kstp video is from Australia, but where more exsactly?

I have been informed, that the steel wires require tremendius support from the building structure - about 20 tons of load. Therefore the building needs to be made to support that load, and it is expensive for other Buildings.

Acording to my calculations, the bungee rig from my question is better than a system with only two fixed points at the ceiling. And I agree about the Wear on the chock cords. However the lines can be split, because you only need about 3 m chock cord at each of the 4 fixed points and then a normal line between to support the Blocks. It will not be possible to use longe.
 

DON'T LURK... Join The Discussion!

Members see FEWER ads

College Gym News

Beam deductions

Hi everyone! I’m hoping to get some help understanding my deductions on beam. I’ve been watching my videos back, but I’m having trouble figuring out exactly where the judges are taking the most off. If anyone is willing to take a look and give me some feedback, I’d really appreciate it. I’m especially curious about execution deductions, rhythm/connection issues, and anything in my acro or dance that might be costing me. The judge started me at a 10 for this routine, and I got a 9.1





New Posts

Back