A
Anonymous (5b8a)
Our gym does not have a pit. Both coaches and parents agree that at this point our girls desperately need one. But the gym owner was very resistant to the idea of putting one in (many excuses, but bottom line is about $). This has been a conversation for years but we are only met with empty promises.
The girls love the coaches so leaving the gym is not the most ideal option for many. Here are my questions:
1. We proposed that the girls train at a nearby gym with a pit once a week on specific skills. The nearby gym is open to it, but the owner said no, citing insurance and liability would be an issue. Has anyone gone down this path? Can we purchase separate insurance from the host gym? Or can we add a rider to our insurance? We are a small team with only 10 girls needing the pit at this point. Our contract does not prohibit this.
2. We have a trench pit bar set, which was actually intended to be a foam pit when it was built. But somehow the plan got changed. Is there anything from the construction perspective that can be done to transform the trench? Ie half trench bar, half pit bar? Our ceiling is on the Lower side too. If yes, what is the timeline and cost we are looking at?
Any experience is appreciated.
The girls love the coaches so leaving the gym is not the most ideal option for many. Here are my questions:
1. We proposed that the girls train at a nearby gym with a pit once a week on specific skills. The nearby gym is open to it, but the owner said no, citing insurance and liability would be an issue. Has anyone gone down this path? Can we purchase separate insurance from the host gym? Or can we add a rider to our insurance? We are a small team with only 10 girls needing the pit at this point. Our contract does not prohibit this.
2. We have a trench pit bar set, which was actually intended to be a foam pit when it was built. But somehow the plan got changed. Is there anything from the construction perspective that can be done to transform the trench? Ie half trench bar, half pit bar? Our ceiling is on the Lower side too. If yes, what is the timeline and cost we are looking at?
Any experience is appreciated.